Azure Power完成建设安德拉邦100兆瓦光伏电站

公開日 2017/06/14
Azure Power 
Azure Power has announced that it has commissioned a 100MW solar power plant in Andhra Pradesh.

The project was auctioned by NTPC. The solar plant has been set up at Kurnool Ultra Mega Solar Park with a total capacity of 1,000MWs. The solar park is being developed by Solar Park Implementation Agency (SPIA) and Andhra Pradesh Solar Power Corporation Limited (APSPCL). Azure Power will supply power to NTPC for 25 years at a tariff of INR 5.12 (~USD 7.9 cents) per kWh. Spread across 500 acres of land in Andhra Pradesh, the project will help in electrifying the nearby areas.

Speaking on this occasion, Inderpreet Wadhwa, Founder and Chief Executive Officer, Azure Power said, "With the commissioning of this plant, we have once again demonstrated our strong project development, engineering, and execution capabilities. We are delighted to make a contribution towards realization of our Hon'ble Prime Minister's commitment towards clean and green energy, through solar power generation. Our sincere gratitude to NTPC and the State of Andhra Pradesh for all the cooperation and support extended."


この記事で言及した企業のENFプロフィール

Azure Power (ソーラー施工): https://jp.enfsolar.com/azure-power
PV業界のニュースは無料で再発行されますので、あなたのニュースを に送ってください