GCL New Energy Signs PPA for 110MW Solar Project In Colorado

公開日 2018/06/15
GCLSI 
GCL New Energy, Inc., a subsidiary of GCL Group, has signed a long-term power purchase agreement with Intermountain Rural Electric Association (IREA) for its Pioneer 110MW greenfield project in Colorado.

The Pioneer 110MW project is located on 611-acre site 35 miles east of Denver, Colorado. The total annual yield of the Pioneer project is around 215 million kWh, and plans to call for connection to the grid in 2020. The PPA has a fixed initial contract term of 10 years, with 3 optional 5-year extensions, for a possible 25-year lifetime.


この記事で言及した企業のENFプロフィール

GCLSI (ソーラーパネル): https://jp.enfsolar.com/gclsi
GCLSI (ソーラーコンポーネント): https://jp.enfsolar.com/gclsi
PV業界のニュースは無料で再発行されますので、あなたのニュースを に送ってください