2BG Completed the expansion of the plant for the crystalline module production of 50 MW (from the previous 25 MW) at AV Project company (Avellino – ITALY), which has brought besides the throughput increase, also the new solutions introduction and a custom-made configuration based on customer needs and production spaces.
With nr. 4 SPIRIT stringers, a total capacity of 2.400 cells per hour, AV Project becomes one of the main Italian producers.
2BG Installs 50 MW Automatic Line for AV Project
公開日 2011/04/08
出所:
2BG
PV業界のニュースは無料で再発行されますので、あなたのニュースを に送ってください