Juwi Builds 82MW Solar Park in Colorado for Duke Energy Renewables

公開日 2019/06/11
JUWI  Duke Energy Sustainable Solutions 
Juwi AG builds an 82MW (AC) solar park in El Paso County, Colorado. The Palmer Solar project contains more than 200,000 solar panels, is being built on land south of Colorado Springs and has recently been acquired by Duke Energy Renewables.

The plant was developed by Juwi and is scheduled to be connected to the grid by the end of this year. Juwi will also act as EPC contractor and will provide O&M services after completion. The solar park will generate enough energy to power approximately 19,000 homes per year.


出所: Juwi
この記事で言及した企業のENFプロフィール

JUWI (ソーラー施工): https://jp.enfsolar.com/juwi
Duke Energy Sustainable Solutions (ソーラー施工): https://jp.enfsolar.com/duke-energy-sustainable-solutions
PV業界のニュースは無料で再発行されますので、あなたのニュースを に送ってください